01
Direct Hardware Sales
Turn-key crossflow turbine and hydraulic power modules for owners/project developers.
02
IP Royalty Licensing
Long-term domestic and international licensing creates an asset-light revenue channel.
03
Core Target Accounts
IPPs, electric utilities, hydro developers, industrial loads and localized microgrids.
Rigorous Federal Validation & Regulatory Support
4.6 GW
Clean, renewable energy potential at U.S. non-powered dams. Significant untapped energy and existing infrastructure resource.
FAST-TRACK
Hydropower Regulatory Efficiency Act supports streamlined small-hydro deployment.
DOE + ORNL
Primary federal studies provide mapped sites, flow data and technical potential baselines. Recent major project award with ORNL to develop manufacturing protocols for turbine fabrication to improve structural performance and lower production costs.
IRS
Federal Income Tax Credits or Payments of up to 50% of qualifying capital costs for new/upgraded capacity hydro projects (Inflation Reduction Act of 2022). Significant economic performance enhancement/risk reduction to project owners.
Algorithmic Lead Generation & Site Selection
Automated Tracking
AI FERC online library searches identify licensing status, history, and availability of target non-powered dam sites.
High-value Targeting
Utility power purchase pricing is cross-referenced with site resource data to estimate site-specific revenue potential.
Pipeline Optimization
DOE flow and generation data are continuously screened against development criteria to produce projected returns from an array of potential development sites.
Immediate regional focus: Ohio • Indiana • Illinois • Kentucky
Strategic Execution Roadmap
2026
Finalize DOE testing, confirm permitting needed, and custom turbine manufacturing automation with DOE at ORNL.
2027
Complete initial pilot installation and performance testing; begin first commercial delivery.
2028+
Scale to repeat installations at preselected / vetted, project pipeline sites and acquire production funding.
Scalable Operations
Funding enables design → permitting → pilot delivery → first revenue.
Initial pilot / first revenue targeted for 2026–2027 in the current business plan.